Solar Works Pakistan

Services · Faisalabad, Lahore, Punjab

What Happens During a Free Solar Site Survey

Short answer

A solar site survey is a visit by an engineer to your home, shop or factory to measure the roof, check your electrical setup and understand your load before any system is designed or priced. At Solar Works Pakistan, site surveys are normally free, and the survey is what makes the quotation accurate. Bring 12 months of electricity bills and make the roof safely accessible, and the visit will be quick and useful.

Why a survey comes before the price

Two buildings with the same bill can need very different systems. One has an open, south-facing roof; the other has water tanks, a stair room and shade from a neighbour's building. One runs most of its load in the day; the other at night. A price given only from a bill amount over the phone is an estimate at best.

We treat every system as a customised engineering solution based on the customer's load, site, budget, energy needs, backup needs, expansion plans and feasibility. The survey gives our engineers the facts to balance generation, reliability, budget and future expansion, rather than designing around one number.

Diagram

What the survey covers

Roof and shade

Space, obstacles, structure type

Load and bills

12 months of bills, main loads

Grid

Meter, phase, DISCO paperwork

Normally free.

The Solar Works project process, step by step

The survey sits early in a fixed sequence. Here is the full process from first call to after-sales support.

  1. Initial discussion. A phone or WhatsApp conversation about what you want: lower bills, backup during load-shedding, or both.
  2. Bills and load details. You share your electricity bills and, where relevant, a list of main loads such as ACs, motors, pumps or machines.
  3. Site survey. An engineer visits to inspect the roof, electrical setup and site conditions.
  4. Load and feasibility assessment. We work out what size and type of system makes sense for your load and site.
  5. Engineering and system design. Our in-house team designs the system and structure layout, with our AutoCAD engineers producing drawings where the project requires them.
  6. Detailed quotation and BOQ. You receive a quotation listing brand, model, quantity, specification and warranty for the main items.
  7. Advance payment. Projects generally run on an advance-payment basis, with milestones set according to project size.
  8. Procurement and execution. Equipment is arranged and the work is scheduled.
  9. Installation. Our own teams install the structure, panels, inverter, protection and cabling.
  10. Testing and safe commissioning. All necessary tests and checks are completed before handover.
  11. Customer training and handover. We show you how to operate the system, the inverter and the monitoring app.
  12. Monitoring and after-sales support. Our own engineering staff handle service, with a 48-hour target to send personnel after a complaint is registered.

Small projects can normally be completed in about a week after the go-ahead, subject to timely payment, equipment availability and site readiness. Larger projects follow a project-specific schedule. Our solar installation services page covers the delivery stages in more detail.

What the engineer checks on site

The roof or ground area

The electrical setup

Your load and how you use it

For factories and commercial buildings, the survey also looks at demand patterns and MDI charges; see our MDI guide and industrial and commercial solar page.

What to prepare before the visit

PrepareWhy it matters
Last 12 months of electricity billsShows units used in every season, not just one month; also shows sanctioned load, tariff and meter type
Roof access (keys, ladder or stairs)The engineer needs to measure and check shade safely
List of main appliances or machinesHelps size the inverter and any battery
Your backup requirementWhich loads must keep running during load-shedding, and for how long
Building drawings, if availableUseful for larger roofs, factory sheds and elevated structures
Budget range and plans for expansionLets us design for now while leaving room to grow
Decision-maker present, if possibleQuestions can be answered on the spot

If you do not have all 12 bills, most DISCO bills show a history of recent months; bring what you have.

After the survey: the quotation

After the survey and design, you receive a detailed quotation and BOQ. Where the equipment has been selected, it names the brand, model, quantity, capacity and warranty for each main item, rather than vague lines like "Tier 1 panels". Manufacturer warranties for panels, inverters and batteries are; our own structure warranty is 3 years, and our service warranty covers the first year under the applicable project terms.

Use our guide on how to read and compare solar quotations to check any offer line by line, including ours. For a rough idea of system size before the visit, try our solar calculator, read how many panels a 5 kW or 10 kW system needs or see typical solar system prices. Our projects start from about 6 kW and go up to megawatt scale.

Get today's price or a free site survey

Book a survey with our engineers.

We serve customers throughout Punjab, 9:00 AM to 6:00 PM, daily, and site surveys are normally free. You can also contact us online.

Frequently asked questions

Is the solar site survey really free?

Site surveys are normally free at Solar Works Pakistan. If anything about your site would change that, we will tell you before the visit.

How long does a solar site survey take?

It depends on the site. A typical home roof takes much less time than a factory with several sheds and distribution boards. Having bills ready and the roof accessible keeps the visit short.

Do I have to buy after the survey?

No. The survey and quotation help you make an informed decision. You are free to compare our quotation with others.

Why do you need 12 months of bills?

Electricity use in Punjab changes a lot between summer and winter. Twelve months shows the full pattern, which matters for sizing panels and batteries and for understanding what you can expect under net billing.

Can you quote without a site visit?

You can start the conversation by sharing your bills and roof photos on WhatsApp. A detailed quotation and BOQ follow the survey, because shade, roof type, cable routes and the electrical setup all affect the design and cost.

Do you survey factories and commercial buildings too?

Yes. Industrial and commercial projects are a core part of our work, from about 6 kW to megawatt scale. These surveys also look at demand patterns, MDI, generators and structure design.