Solar company in Faisalabad and Lahore, installing across Punjab

Solar Works Pakistan started in Faisalabad in 2022, and we now have an office in Lahore too. One team looks after your system, from the first site survey through to after-sales service. We use tier-1 panels and genuine inverters. If anything needs attention after installation, you call us and we sort it out, including warranty claims.

Modern house with rooftop solar on an elevated structure

Homes

Hybrid + LiFePO₄ · fans, lights and fridge stay on

High bills and long outages. Usually a hybrid system with a lithium battery so the fans, lights and fridge stay on when the grid drops.

Across Punjab

Not sure what size system you need? Let's work it out together.

We'll look at your usage and your roof, then recommend a system that fits both. More than 300 customers in Faisalabad, Lahore and across Punjab run on systems we built.

Message us on WhatsApp
Solar calculator

What size system do you need?

Enter your summer bill, set what you run, and tell us when your ACs run. The estimate updates as you go.

units / month, from any month June to August on your LESCO / FESCO bill
2. What do you run?
3. When do your ACs run?Most homes run ACs at night. Panels only work in daylight, so night AC runs on the battery and needs more battery and more panels to charge it.
Recommended: hybrid system
7.15 kW10 × 715 W panels
Hybrid inverter6 kW
LiFePO₄ battery2 × 10 kWh
Roof space34 m² / 366 sq ft
Approx. costRs 11.4 lakh
Saves aboutRs 52,207 / month
On-grid net billing would saveRs 33,749 / month
Pays for itself in1.8 years
Net billing pays very little for the units you export, so storing your solar in a battery earns you more.
Units your system makes each monthAbout 11,353 units a year · you use about 920 units a month
Send this estimate on WhatsApp

Estimate only. We confirm the final size on a free site survey.

Which system fits?

Pylontech Fidus LiFePO₄ battery
HybridRecommended for you

Energy independence that pays for itself

Panels, a hybrid inverter and a lithium iron phosphate (LiFePO₄) battery working as one system. Solar runs your home by day and charges the battery; the battery carries you through the evening and through load-shedding. You rely far less on the grid, so the bill drops and the lights stay on.

10 yearsmanufacturer's warranty on new batteries
8,000–10,000rated life cycles
Works during load-sheddingYes
BatteryLiFePO₄
Exports surplus to gridYes
Best forHomes with load-shedding
Bi-directional green net meter
On-grid

Grid Dependent

Panels and an on-grid inverter run your load in daylight, with the grid covering the rest. There is no battery, so the system switches off during an outage. Surplus units go back to the grid and are credited on your bill:

Net metering: units you export are offset against units you import, so you pay only for the difference.

Net billing: exported units are credited at the export rate, and imported units are billed at the normal tariff.

Works during load-sheddingNo
BatteryNone
Exports surplus to gridYes
Best forHomes with a stable grid
Containerised battery energy storage system
BESS

Storage for industrial & commercial use

Battery energy storage for factories, warehouses, hospitals and commercial buildings. Sized against your load profile to keep production running through outages, shave peak-demand charges and store solar for use when you need it.

60 kWh to gigawatt scaleEvery project is planned around your site, so the move from grid supply to energy independence is seamless.
Works during load-sheddingYes
BatteryCommercial-scale
Exports surplus to gridCase by case
Best forFactories and C&I sites

Still not sure? Send us your electricity bill.

We'll read your usage and recommend the right system with a free quote.

WhatsApp your bill

Recent installations

Jobs finished across Lahore, Faisalabad and the districts around them. Photographed as we left them.

Wall mounted hybrid inverter with two lithium batteries and twin protection boards in a home
Hybrid inverter beside a tall lithium battery cabinet and an isolator in a house
Hybrid inverter on a shelf above an enclosed protection box
Inverter and conduit run along a wooden ceiling above a long cable tray
Hybrid inverter with a floor standing lithium battery and a metered distribution panel
Two inverters side by side above a row of switchgear on a panelled wall
Two purple cased inverters with a protection board on a shelved wall
Hybrid inverter with a wall meter and a compact protection box
Hybrid inverter above an open protection board and a lithium battery
Hybrid inverter with conduit dropping to a meter and switch below
Hybrid inverter on a shelf with a meter and a red protection board below
Inverter, meter and protection enclosure spread along a workshop wall
Inverter and battery mounted high above a commercial doorway
Hybrid inverter with two small lithium batteries on a tiled wall
Hybrid inverter above a tall floor standing lithium battery
Purple cased inverter with a protection board and a wall lithium battery
Commercial inverter with conduit to a metered panel and a battery rack
Two Solar Works Pakistan technicians in branded shirts installing an inverter
Hybrid inverter, two Dyness batteries and Solar Works Pakistan branded distribution boards in Faisalabad
Hybrid inverter with a lithium battery and a long conduit run in a corner

How a project runs

Before any work starts
2–3 days on site
For the life of the system
Two Solar Works engineers measuring a flat rooftop with a tape and clipboard
Step 1· Before work

Site survey

We visit, measure the roof, check your bills and note your load. Shading, wiring and meter position all get recorded.

Design engineer reviewing a rooftop panel layout on screen with the equipment list
Step 2· Before work

System design

You get a layout, an equipment list and an honest estimate of what the system will generate month by month.

Boxed panels, inverter, battery and cable reels being unloaded at a house gate
Step 3· Before work

Supply

Panels, inverter, battery, structure and protection gear arrive together so the install is not held up.

Two installers fixing panels onto an elevated steel structure on a rooftop
Step 4· On site

Installation

Structure, wiring, boards and commissioning by our own team. Most home systems are finished in two to three days.

Technician showing a homeowner the monitoring app beside the installed inverter
Step 5· After

Monitoring and support

App set up, readings explained, and a number to call when something looks wrong.

Get a number you can trust

Send us your last electricity bill and we will tell you what solar will do for it.

Message the bill and your city on WhatsApp. We reply with a system size, an equipment list and a price range before anyone visits.

WhatsApp 0336 6664321

Shop Now

Genuine stock from the brands we install ourselves.