Solar Works Pakistan

Installation · Faisalabad, Lahore, Punjab

What does a solar site survey include?

Short answer

At the survey we measure the roof, check shading through the year, look at the roof’s condition and access, and note your electrical board, earthing, meter and connection type.

We go through your bills and the appliances you want on backup, then agree where the inverter and battery will go. From that we prepare the design and a final itemised quote. Surveys are normally free.

Read the full article

Diagram

The survey, step by step

  1. 01Bills and load list
  2. 02Roof measured, shading checked
  3. 03Roof condition and access
  4. 04Board, earthing, meter, phase
  5. 05Inverter, battery and cable route
  6. 06Design and itemised quote
Have ready:
12 months of billsBackup appliance listRoof accessExpansion plans
Carried out by our own teams for homes, farms and businesses across Punjab.

What to have ready

  • Your last 12 months of electricity bills.
  • A list of the appliances you want on backup.
  • Access to the roof and the main electrical board.
  • Any plans to extend the house or the system.

After the survey

You receive a design with the system size, panel layout, structure type and equipment, and a quote with every item listed and a validity date.

Surveys from our offices

Surveys are carried out by our own teams from the Faisalabad and Lahore offices, for homes, farms and businesses across Punjab.