What you will see
- Backup drops when an AC or pump starts
Why it happens
Heavy and motor loads on backup.
Diagram
Starting surge tips backup over
Lights, fansAC or pump startsRunning
Illustration. Alarm 12 / 55
What you can check yourself
- Switch off heavy loads during load-shedding
What not to do
- Do not swap EPS and grid wiring (Alarm 13 AC Port Reversed)
When to call us
- Review backup circuits
- Divide loads or size up
Load division
We plan Sineng backup circuits for homes in Faisalabad and Lahore.
Send us
list of backup loads and the alarm