What you will see

  • Backup drops when an AC, motor or pump starts
  • Over-Load during load-shedding

Why it happens

Motors draw a big start-up surge on top of other loads.

Diagram

Starting surge tips backup over

Lights, fansAC or pump startsRunning

Illustration. Over-Load: move inductive loads off backup.

Solis S6-EH1P hybrids.

What you can check yourself

  • Switch off heavy loads in load-shedding
  • See our load division article

What not to do

  • Do not connect grid wiring to the backup port

When to call us

  • Review backup circuits
  • Check backup port wiring for OV-Vbackup

Load division

We plan Solis backup circuits for Faisalabad and Lahore homes so they stay on.

Send us

list of backup loads and the alarm