What you will see

  • Soot or debris on modules and nearby equipment.
  • Heat-discoloured supports, cables or enclosures.
  • Water exposure during firefighting.
  • An inverter that appears intact while surrounding materials are damaged.

Why it happens

DOE’s wildfire guidance addresses PV-system exposure and fire-related vulnerabilities. The review should consider the installation as a whole rather than treating surface cleaning as confirmation of safe operation.

The building structure, electrical equipment and affected roof may need different specialists. Ask who is responsible for each assessment and how findings will be combined before return to service.

Preserve the event record and any available pre-incident photographs. Decisions about repair or replacement should follow documented findings and the applicable manufacturer guidance, not a visual guess from ground level.

Diagram

A coordinated inspection

Electrical

Panels, cables, inverters.

Structure

Supports and fixings.

Roof

Building and waterproofing.

An intact-looking inverter can sit among damaged materials.

DOE wildfire guidance. Applies to LONGi, Jinko panels and Solis, GoodWe, Growatt and Huawei inverters.

What you can check yourself

  • Keep the area restricted until access is authorised.
  • Provide existing equipment lists and system drawings to responders.
  • Record the event timeline from a safe location.
  • Retain inspection, insurance and service references where relevant.
  • Photographs are useful only when already available or obtained without entering a restricted or hazardous area.

What not to do

  • Do not wash soot from damaged equipment, reconnect loose cables or test the system by restarting it. Do not walk across a fire-affected roof or assume a main switch removes every possible electrical source.

When to call us

  • Contact us after emergency response has been initiated so the solar assessment can be coordinated with the building and electrical professionals. Restart requires appropriate clearance.

After a fire in Faisalabad and Lahore

Once authorities allow access, tell our Faisalabad or Lahore team the location, date and exposure.

Send us

Tell Solar Works Pakistan your city and area, affected location, event date, known exposure, responsible site contact and available incident records.