EV Charger Installation for Homes and Businesses in Punjab

Short answer

Solar Works Pakistan installs EV chargers for homes, offices, factories and commercial sites across Punjab. We size the charger to your car and your electricity connection, wire it on its own protected circuit, and, if you have or are planning solar, set it up so your car charges from your panels during the day. Every installation starts with a site survey, which is normally free, and is carried out by our own teams.

An electric car is the biggest single load most homes will ever add. A charger that is fitted well is safe, charges at the speed your car can actually accept, and does not trip your supply or overload your connection. That is the work this service covers.

What the service includes

Diagram

EV charger installation

Survey

Connection, load and parking spot

Dedicated circuit

Own cable, breaker and earth-leakage protection

Test and handover

Insulation, earthing and app setup

Charging can be scheduled to use daytime solar first.

Which charger do you need?

Most EV owners in Pakistan charge at home overnight or at work during the day, using an AC charger. The table shows the common types.

Charger typeTypical powerConnection neededBest for
Portable charging cable (comes with many cars)about 2 to 3.5 kWDedicated single-phase socketOccasional charging, low daily driving
Wall-mounted AC charger, single-phaseabout 7 kWSingle-phase, on its own circuitMost homes; full overnight charge for most cars
Wall-mounted AC charger, three-phaseabout 11 or 22 kWThree-phase connectionLarger homes with three-phase supply, offices, fleets

Power figures are typical classes, not a specific product. for the model you choose.

The car decides the charging speed, not just the charger

Every electric car has an on-board charger that limits how fast it can take AC power. If your car's on-board charger accepts about 7 kW, a 22 kW wall charger will still only charge it at about 7 kW. Before choosing, we check your car's manual or specification sheet for:

Connector types

Most AC chargers and many cars sold in Pakistan use the Type 2 connector, while some imported Chinese models use the GB/T connector, and DC fast charging commonly uses CCS2. Adapters exist but are not a substitute for the correct cable; we fit a charger with the connector your car is designed for.

How we install an EV charger

  1. Survey. We note your connection type, sanctioned load, distribution board space, existing earthing and the distance to the parking spot. See what happens during a site survey.
  2. Load calculation. A car charging at 7 kW for several hours is a large, continuous load. We add it to your existing evening and night loads (ACs, geysers, water motors) to check that your sanctioned load and incoming cable can carry it.
  3. Connection upgrade, if needed. If the numbers do not fit, we explain your options: a smaller charger, charging at different hours, increasing your sanctioned load, or moving to a three-phase connection.
  4. Cable and protection design. The charger gets its own circuit, using properly sized copper cable from approved brands (see solar and power cables), a dedicated breaker, and earth-leakage protection of the type the charger maker specifies (see breakers and protection).
  5. Earthing. A charger must have a reliable earth. We test the existing earth and improve it where needed (see earthing and surge protection).
  6. Mounting. We fix the charger where the cable reaches the car's charging port without strain, out of standing water and, where possible, out of direct afternoon sun.
  7. Testing and commissioning. Insulation resistance, earth continuity, protection trip tests and a live charging test with your car.
  8. Handover. You get the charger's manual, the manufacturer's warranty document, and a walk-through of scheduling and app settings.

Safety: what we never do

These points matter more in Pakistan's summer heat, when cables and breakers already run warm. Electrical work on chargers must be done by qualified electricians.

Charging your car from solar

If you have solar, or are planning it, your car can become one of the best uses of your daytime solar energy.

Under the net-billing rules in force since February 2026, units you export to the grid are credited at a much lower rate than the units you buy, so using your own solar at home is usually worth more than exporting it(/guides/net-metering-net-billing-pakistan/)]. A car parked at home during the day can soak up surplus midday solar instead of sending it to the grid.

How we set this up:

Solar shades over parking spaces can do two jobs at once: shade the car and generate power for it. See solar carports and canopies.

Your electricity connection and bill

Home charging. A home charger is part of your household load, so it uses your existing connection. The main questions are whether your sanctioned load and phase can carry it, and whether your evening charging pushes you into higher-priced slabs or peak hours. Charging during solar hours helps with both. See load management.

For businesses, factories and housing societies

For three or more chargers, we design the supply, cable routes and protection as one system rather than adding chargers one by one.

Price of EV charger installation

What you getPrice
Installation of a portable charging cable on a dedicated socket circuitWhatsApp for today's rate
Single-phase 7 kW wall charger, supplied and installedWhatsApp for today's rate
Three-phase 11 kW wall charger, supplied and installedWhatsApp for today's rate
Three-phase 22 kW wall charger, supplied and installedWhatsApp for today's rate
Additional cable run per metre beyond the standard lengthWhatsApp for today's rate
Solar integration and charging schedule setupWhatsApp for today's rate

The final price depends on the distance from your distribution board to the parking spot, the cable size needed, whether your board needs new breakers, and any earthing work. We confirm everything in writing in your quotation before work starts.

Warranty and after-sales

Why choose Solar Works Pakistan for your EV charger

Get today's price or a free site survey

Send us your car model, a photo of your distribution board, your connection type (single-phase or three-phase) and where you park. We will tell you what charger fits and what the installation involves.

Frequently asked questions

Do I need solar to install an EV charger?

No. We install chargers on homes and businesses with or without solar. Solar simply lets you charge from your own panels during the day, which is usually cheaper than buying the same units from the grid.

Can I charge an electric car from a normal 3-pin socket?

Some cars come with a portable cable for this, but charging draws high current for many hours. It should only be done on a dedicated, properly protected and earthed circuit, never through an extension lead. For daily use, a wall charger on its own circuit is safer and faster.

Is a 7 kW charger enough, or do I need 22 kW?

For most homes, a 7 kW single-phase charger fully recharges most cars overnight. A 22 kW charger only helps if your car can accept 22 kW AC and you have a three-phase connection. Many cars charge at about 7 to 11 kW on AC whatever the charger's rating.

Will an EV charger overload my house connection?

It can if it is added without a load check. During the survey we add the charger to your existing loads and compare the total with your sanctioned load and supply cable. If it does not fit, we suggest a smaller charger, different charging hours, or a load increase.

Do I need a three-phase connection?

Not for a single-phase 7 kW charger, which suits most homes. Three-phase is needed for 11 or 22 kW AC chargers and is often sensible for larger homes, offices and fleets. See three-phase vs single-phase.

Can my car charge from solar automatically?

Yes, within limits. Many chargers and hybrid inverters can schedule charging for solar hours, and some can adjust charging speed to your solar surplus. We set this up where your equipment supports it.

How long does installation take?

A straightforward home installation is usually quick once the charger and materials are on site, but the time depends on cable distance, board changes and any connection upgrade. We confirm the schedule in your quotation, subject to payment, stock and site conditions.

Do you install chargers in Lahore and other Punjab cities?

Yes. Our head office is in Faisalabad and we have a branch in Lahore, and our teams serve customers throughout Punjab.

Sources

  1. Profit (Pakistan Today): NEPRA sets EV charging tariff at Rs 23.57 per unit plus market margin, 25 May 2025