Load shedding & batteries · Faisalabad, Lahore, Punjab

How does a SAJ H2 hybrid handle load-shedding?

Short answer

The SAJ H2 runs a backup (off-grid) port from battery and solar when the grid goes off. If backup loads are too high, the battery is low or too hot or cold, it reports OffGrid Voltage Low (16) and you should reduce the load.

A short on backup wiring shows Output Shorter (17).

We plan backup circuits during design.

Backup planning

We plan SAJ backup circuits in Faisalabad and Lahore.