Load shedding & batteries · Faisalabad, Lahore, Punjab

How does a Sineng hybrid handle load-shedding?

Short answer

Sineng SN HS and HT hybrids power an EPS (backup) circuit from battery and solar when the grid goes off. If backup loads exceed the rating, they report EPS Overload (Alarm 12) or EPS over current (55).

The EPS neutral must be wired correctly to the grid neutral; Sineng reports Alarm 16 if not.

We plan and wire backup circuits during installation.

Backup planning

We plan Sineng backup circuits for homes in Faisalabad and Lahore.