What you will see

  • Code 323 on an SH hybrid
  • Appeared after electrical work or a new changeover switch
  • Backup will not start

Why it happens

The backup port must only feed loads. If grid power reaches it through a shared neutral, a bridged breaker or a wrongly wired changeover, the inverter sees two sources fighting.

Diagram

Backup port must only feed loads

Correct

Backup portOut
→
Backup loadsPowered

Wrong wiring

GridReaches backup
→
Backup portCode 323

Usually a changeover or board fault. Call an engineer.

Applies to Sungrow SH hybrids.

What you can check yourself

  • Note any recent changes in the board or changeover
  • Switch off the inverter AC breaker if safe and wait for an engineer

What not to do

  • Do not connect grid supply to the backup port
  • Do not short or bridge backup and grid circuits

When to call us

  • Trace backup and grid circuits in the board
  • Correct changeover wiring
  • Test before re-energising

Changeovers and boards

Home-made changeovers are a frequent cause in Punjab. Our engineers in Faisalabad and Lahore rewire backup circuits safely.

Send us

the fault code and photos of your board and changeover from outside