What you will see
- A short export indication after a large load switches off.
- An isolated point in the cloud graph.
- Repeated or sustained export during normal operation.
- A change after meter, current-transformer or controller work.
Why it happens
Solis explains that control response takes time after load changes and that monitoring can capture a transient export condition. Its guidance also stresses correct meter and current-transformer installation for monitoring and control.
A transient explanation should not be used to dismiss persistent export. The installer should verify the measurement arrangement, controller status, configured objective and behaviour under the site’s operating conditions.
If an export restriction is part of the site’s agreement, provide that requirement for the review. Equipment capability and the agreed acceptance criteria must be assessed together.
Transient or persistent?
Short blip
A large load switches off. Control takes a moment.
Repeated or sustained
Check meter, CT and controller setup.
A transient explanation does not dismiss persistent export.
If you are new to export limiting, our zero export device guide explains how it works and when you need it. This page is for a system that already has it and is not behaving.
What "zero export not working" means
Zero export (also called export limiting or anti-backflow) is a feedback loop. A CT clamp or small smart meter at your grid connection measures which way power is flowing. The inverter reads that signal many times a second and cuts its output as soon as power starts to flow out to the grid.
If any part of that loop is wrong, the inverter cannot tell import from export. Three things then happen:
- The inverter keeps exporting, because it believes the house is still importing.
- Your DISCO meter records export units that you may not be entitled to without an approved net billing agreement. See our net metering and net billing guide.
- The app shows odd numbers, such as negative consumption or import and export swapped.
Normal versus not normal
| What you see | Usually |
|---|---|
| A brief export spike when an AC, iron or pump switches off, then back to zero within seconds | Normal; the control loop needs a moment to react |
| Export creeping up through a sunny, low-load afternoon | Not normal |
| Export on one phase while the other phases import (three-phase) | Possible design issue: limit set on total power, not per phase |
| App shows export but the DISCO meter does not | Possibly an app or CT sign problem, not real export |
Zero export not working
CT or meter
Placed or wired wrongly
Communication
Meter link lost
Settings
Export limit not enabled
Quick-check table
| Symptom | Likely cause | Safe owner check | Call an engineer if... |
|---|---|---|---|
| Inverter exporting with zero export switched on, all day | CT sensor wrong direction, so export reads as import | Switch off big loads at midday and watch the app: does "export" or "consumption" go the wrong way? | Export rises when load falls |
| Export only some days or after a power cut | Meter or CT communication lost; fail-safe not enabled | Look for a meter or CT communication alarm on the screen or app | The alarm appears at all |
| Export limit not working after a firmware update or reset | Setting reverted to default or changed | Note the date of any update or reset and screenshot the export setting page if your app shows it | Setting shows off or unlimited |
| Export on one phase, import on others | CT on wrong phase, or limit mode on total power | Compare per-phase readings in the app, if shown | Your meter records per-phase export; see phase imbalance |
| Second inverter or old on-grid inverter still exporting | Only one inverter is under export control | Count the inverters on site and check each in the app | More than one inverter feeds the same connection |
| App says zero export but meter shows export units | CT on a cable after some loads branch off, or wrong sign in app | Read the meter's export register on two days, same time | Register increases on sunny days |
| Consumption shows negative in the app | CT reversed or wrong sign setting | Screenshot at a time you know you are importing (evening, loads on) | Numbers are reversed; see solar app showing wrong data |
Safe owner checks
You can do the following from the app, the inverter screen and your appliances.
Safety. The CT clamp and meter sit on live mains cables inside the distribution board. Do not open the board, move the CT or change installer-level settings. If you see scorch marks or smell burning, switch off in the order your installer showed you, keep away and call a qualified engineer.
- Check the time and conditions. Zero export only matters when solar is bigger than your load: usually late morning to mid-afternoon on clear days, with few appliances running.
- Read the inverter screen and app for alarms. Look for messages about the meter, CT, smart meter or power sensor. Names vary by brand. Our inverter faults guide covers common ones.
- Do a simple load test. At midday, with the app open, switch on a large load such as an electric kettle or iron and note the reading. Then switch it off. With a correct CT, consumption rises when you switch on and export stays at or near zero when you switch off. If the numbers move the wrong way, the CT direction or sign is probably wrong.
- Read the DISCO meter. If your meter shows separate import and export registers, write both down at the same time on two or three days. Do not open or tamper with the meter. If the export register rises on sunny days, real export is happening. Our AMI smart meters guide explains two-way meters.
- Check for recent changes. A firmware update, new dongle, router change, rewiring or a new appliance circuit added after a certain date are all useful clues. If the inverter's controller depends on its dongle or logger, a dongle problem can stop limiting too; see inverter Wi-Fi setup and solar app offline.
- Take photos and screenshots. Inverter model, screen, app power-flow page at midday, and the meter display.
What an engineer will check
- CT polarity. Solis's own guidance, for example, sets up a pure import condition and expects every phase to read as import; any phase showing export has a reversed CT, fixed by turning it round on the cable. Other brands use a similar logic. Some apps, such as SolisCloud, also have a CT detection function that installers can run under set conditions.
- CT position. The CT must be on the main incoming cable, before any circuit branches off. If it sits after a branch, the inverter does not see the load on that branch.
- Phase matching on three-phase sites. Each CT must be paired with the right voltage phase. A mismatch can give wrong readings or even flip the sign.
- Meter communication. The meter type, address and communication wiring must match what the inverter expects.
- Limit mode and fail-safe. Huawei's manual, for example, offers unlimited, zero-power and limited-power modes, a choice between total power and single-phase limiting, and a fail-safe that reduces output when meter data is lost. On a meter that records each phase separately, limiting total power may not be enough.
- Multiple inverters. Where there are several inverters, they need a shared controller or logger so all of them limit together.
- Hybrid behaviour. When the battery is full, a hybrid must throttle; the engineer checks battery and export settings work together.
How to prevent zero export problems
- Ask for a load test at commissioning, with the app open, showing export held at zero.
- Keep a screenshot of the correct export settings and the inverter's firmware version.
- After any firmware update, dongle replacement or rewiring, repeat the simple load test.
- Do not let anyone add circuits ahead of the CT position in the board.
- If you later get an approved net billing agreement, have the limit changed properly rather than switched off. If credit then does not appear, see net billing credit not showing.
For Solar Works customers
Our engineers fit the sensor approved by the inverter manufacturer, set the limit during commissioning and test it under real load. If export appears on a system we installed, WhatsApp 0336 666 4321 with the inverter model, a photo of the screen and screenshots of the app's power-flow page at midday. Our 1-year service warranty applies under the applicable project terms, and after-sales complaints are handled by our own engineering staff. See how after-sales service works and the Huawei and Solis brand pages.
We can also diagnose export-limiting problems on systems installed by other companies, as a chargeable visit in Punjab.
Frequently asked questions
Why is my inverter exporting with zero export on?
Most often the CT sensor is facing the wrong way, is on the wrong cable or phase, or has lost communication with the inverter. Less often, the setting has reset after an update or is limiting total power while one phase still exports.
CT sensor wrong direction: what happens?
The inverter reads export as import. Instead of cutting back, it can push more power out, and the app may show negative consumption. An engineer fixes it by turning the CT round or correcting the setting, then repeats a load test.
Why is my export limit not working after a power cut?
The meter or CT link may not have come back properly, or the dongle that acts as the controller may be offline. Check for a communication alarm. A correctly set fail-safe should reduce output when meter data is lost.
Is a small amount of export normal with zero export?
A brief spike of a second or two when a heavy load switches off can happen while the inverter reacts. Export that builds up over an afternoon is not normal and should be checked.
Can I move the CT clamp myself?
No. It sits on live mains cables inside the distribution board. Moving or opening it must be done by a qualified electrician with the supply isolated.
Why does my app show export but my meter does not?
The app's sign or CT setting may be reversed, so it labels import as export. Compare the meter's registers over a few days. If the meter shows no export, ask your installer to correct the app setting.
Does zero export work during load-shedding?
During load-shedding there is no grid to export to. An on-grid inverter shuts down, and a hybrid supplies only its backup loads from solar and battery.
Sources
- Solis, "Smart meter phase rotation and CT polarity verification"
- Solis, "CT detection function on the SolisCloud app"
- Huawei, SUN2000-(3KTL-10KTL)-M0 user manual, "Setting export limitation parameters"
What you can check yourself
- Save the full graph and the event timestamp.
- Note whether a major load changed at that time.
- Record any meter or communication alarm.
- Gather the commissioning record and relevant export requirement.
- Distinguish an instantaneous power reading from accumulated exported energy. They answer different questions about the event.
What not to do
- Do not disable control, reverse a current transformer or change grid protection. Do not assume that a small recorded export is automatically permitted. Avoid deliberately cycling large loads to test compliance yourself.
When to call us
- Request review for sustained export, repeated control alarms or uncertainty about the system’s performance against the agreed restriction.
Export limits in Faisalabad and Lahore
Send our Faisalabad or Lahore team graphs, controller details and your export requirement.
Send us
Graphs, controller details, alarm records, recent changes, the relevant site requirement, and your city and area.
Technical references
Reviewed 25 September 2026. Manufacturer documents are cited for general principles; your exact model’s manual always applies.