Our solar inverter faults guide explains faults on all brands. For Sungrow models and prices, see Sungrow inverters and batteries; for commercial buyers choosing a brand, see Huawei vs Sungrow.

What Sungrow inverter error codes mean

Sungrow inverters watch grid voltage and frequency, insulation of the solar wiring, string polarity and current, temperature and, on SH hybrids, the battery. When one goes out of range, the inverter records a fault or alarm code and either stops or carries on with reduced output.

  • Faults vs alarms. Sungrow groups its codes into a "system fault" set and a "system alarm" set. A fault usually stops the inverter; an alarm warns while it keeps running.
  • Several numbers, one meaning. Sungrow often gives one condition more than one code, for example grid overvoltage is listed under codes 2, 3, 14 and 15. Some apps and FAQ titles add an "EC" prefix or leading zeros (EC714, 010).
  • Where to read it. iSolarCloud shows the code, name and time. On SH RS home hybrids, Sungrow's manual says you can touch the LED indicator to view the error code when the inverter is in an error state.

Codes can differ by model, so confirm with your manual.

Diagram

Reading a Sungrow fault

Grid faults

Voltage, frequency, no grid

PV faults

Insulation and string faults

Device faults

Temperature and internal

Note the fault code and when it appears.

Sungrow fault codes by type

The code numbers and names below come from Sungrow's official installer FAQ index. The "what it means" column is our plain-language explanation.

Grid codes, including sungrow grid overvoltage

CodeSungrow nameWhat it means
2, 3, 14, 15Grid OvervoltageGrid voltage above the protection limit, either instantly or over time
4, 5Grid UndervoltageGrid voltage below the limit
8Grid OverfrequencyFrequency too high
9Grid UnderfrequencyFrequency too low
10Grid Power OutageNo grid detected
13Grid AbnormalGrid outside normal conditions
17Grid Voltage ImbalancePhases unequal on a three-phase supply
323Grid ConfrontationListed by Sungrow as a grid fault; ask your installer to check AC wiring and settings

Sungrow grid overvoltage (codes 2, 3, 14, 15) is the most common grid fault in Punjab. When it repeats around midday on sunny days, the usual cause is voltage rise: your export pushes an already high local voltage over the limit. See inverter tripping on high grid voltage. Protection limits must not be changed without an engineer and DISCO rules.

Code 10 during load-shedding is normal; an on-grid inverter must stop and a hybrid should switch to battery. See inverter grid fault during load-shedding. Code 17 on a three-phase site points to a weak or missing phase; see inverter phase loss error.

Insulation, earthing and the sungrow pv insulation fault

CodeSungrow nameWhat it means
39Low System Insulation ResistanceInsulation between the solar wiring and earth too low
12Excess Leakage CurrentLeakage current from the system too high
106Grounding Cable FaultProblem with the earth connection
1600-1615, 1632-1655PV Grounding FaultA PV input has a fault to earth

The Sungrow PV insulation fault (039) behaves like isolation faults on every brand: it often appears on damp winter mornings or after rain, then clears once the array dries. Sungrow even publishes a separate FAQ on how it detects low insulation, because it is so common. A healthy array should not do this, so the weak point must be found. See our inverter isolation fault guide.

PV string codes

CodeSungrow nameWhat it means
28, 29, 208, 212, 448-479PV Reverse Connection Fault (spelt "Reserve" in Sungrow's index)A string connected with reversed polarity
532-547, 564-579PV Reverse Connection AlarmReverse polarity warning on a string
548-563, 580-595PV Abnormal AlarmA string behaving abnormally, such as low or no current
264-283MPPT Reverse ConnectionReverse polarity at an MPPT input
1548-1579String Current RefluxCurrent flowing backwards into a string

All of these are engineer-only: the cure involves live DC wiring. A PV abnormal alarm on one string is often shading, a failed connector or a damaged cable. Too many panels in series causes overvoltage instead; see PV over voltage error.

Temperature codes

CodeSungrow nameWhat it means
37Excessively High Ambient TemperatureToo hot around or inside the inverter
43Excessively Low Ambient TemperatureToo cold to run

Sungrow also publishes guidance on overtemperature derating, where the inverter reduces output rather than stopping. In Punjab summers the fix is usually shade and airflow: see inverter overheating.

Hardware codes

CodeSungrow nameWhat it means
332-363Boost Capacitor Overvoltage AlarmInternal DC stage warning
364-395Boost Capacitor Overvoltage FaultInternal DC stage fault
1616System Hardware FaultInternal hardware problem

For hardware codes, restart once by the manual's sequence; if the code returns, it needs your installer and possibly a manufacturer's warranty claim.

Sungrow battery error codes

Sungrow's FAQ index names two battery-side codes on its hybrids:

CodeSungrow nameWhat it means
714 (EC714)BMS communication faultThe inverter has lost communication with the battery's management system
51 (EC51)Back-up overloadBackup loads exceeded what the SH RS or SH RT hybrid can supply, so it shut the backup output down

A Sungrow battery error such as 714 usually comes from a loose or wrong communication cable, a battery and inverter combination that is not approved, or a battery that has shut itself down. These are installer checks; see battery and inverter communication. For code 51, switch off heavy backup loads such as ACs and motors; see inverter overload. Other battery codes (temperature, voltage, module faults) are listed in your battery's manual.

For factories with Sungrow PowerStack or larger storage, alarms are handled through the site's monitoring and O&M routine; see our industrial and commercial solar page.

Quick-check table

SymptomLikely causeSafe owner checkCall an engineer if...
Code 2/3/14/15 on sunny afternoonsVoltage riseNote times and grid voltage in iSolarCloudIt happens most days
Code 10 with WAPDA onTripped AC breaker or voltage protectorLook at the breaker and protector, without opening the DBA breaker trips again after one reset
Code 039 on damp morningsWater at a weak connector or cableNote weather; view wiring from a safe spotIt persists after drying
Code 37 in summerHeat or poor airflowCheck shade and space around the unitIt continues after airflow improves
Code 714Battery link or BMSCheck the battery is switched onIt does not clear after one correct restart
Code 51 in load-sheddingToo much backup loadSwitch off heavy loadsIt trips with normal loads

Safe owner checks, step by step

Safety box. Panels produce DC whenever there is daylight, and batteries can deliver very high currents. Never open the inverter or battery, never pull MC4 connectors or battery cables. If you smell burning, see smoke or water inside equipment, or feel a shock from metal, switch off in the order your manual gives, keep away, and call a qualified engineer.

  1. Screenshot the iSolarCloud fault with code, name and time, and check the fault history.
  2. Note the inverter and battery models from their labels.
  3. Check the grid, your AC breaker and any voltage protector.
  4. Note the pattern: midday, damp mornings, rain, load-shedding, or a heavy load starting.
  5. Restart once in the manual's order and wait as it instructs. See how to restart a solar system safely.
  6. Keep vents and the area around the inverter clear.
  7. If iSolarCloud shows offline but the inverter looks normal, see solar app offline.

What an engineer will check

  • Grid codes: voltage at inverter and meter, AC cable size and joints, phase balance and the grid code setting.
  • 039, 012, 106: insulation resistance of each string, earth connections, connectors and cable damage.
  • PV string codes: polarity, connectors, shading and string current comparison.
  • Temperature codes: location, ventilation, fans and loading.
  • 714 and battery codes: communication cable and port, approved battery pairing, BMS status and firmware.

How to prevent repeat faults

  • Install the inverter in shade with good airflow.
  • Design strings for winter voltage and check polarity at commissioning.
  • Protect DC cables from edges, sun and rodents; use matched connectors.
  • Wash panels gently without spraying connectors.
  • Use only approved battery pairings and keep firmware updated through your installer.

If Solar Works installed your Sungrow system

Our own engineers handle after-sales. WhatsApp 0336 666 4321 with a screenshot of the iSolarCloud fault and your inverter and battery models. Our 1-year service warranty applies under the applicable project terms; equipment faults go through the manufacturer's warranty per product. See how after-sales service works.

We can also inspect Sungrow systems installed by other companies, as a chargeable service, across Punjab.

Frequently asked questions

What does error code 010 mean on a Sungrow inverter?

It is Grid Power Outage: the inverter cannot detect the grid. During load-shedding that is normal. If WAPDA supply is on, check the AC breaker and voltage protector, then call your installer.

What is Sungrow error code 039?

It is Low System Insulation Resistance, meaning the solar wiring has too little insulation to earth. It often shows on damp mornings. If it stays after the panels dry, an engineer must test the strings.

Why does my Sungrow inverter show grid overvoltage?

Codes 2, 3, 14 and 15 mean grid voltage went above the limit. On sunny afternoons this is usually voltage rise from your export. An engineer should measure voltage and check the AC cable.

What is EC714 on a Sungrow hybrid?

It is a BMS communication fault: the inverter cannot talk to the battery. Check the battery is switched on, then call your installer to check the cable and pairing.

How to check Sungrow error codes in iSolarCloud?

Open your plant, then the device or fault list, to see the code, name and time. Screenshot it before restarting anything.

Can I reset a Sungrow fault myself?

Restart once using your manual's sequence. If the same code returns, or a breaker trips again, stop and call an engineer.

Do you service Sungrow inverters installed by other companies?

Yes, we can inspect other installers' Sungrow systems across Punjab as a chargeable service. Send the screenshot and models on WhatsApp 0336 666 4321 first.

Sources

  1. Sungrow, Installer FAQs (index of fault and alarm code FAQs)
  2. Sungrow, SH3.0-6.0RS / SH5.0-6.0RS User Manual (indicator and error code viewing)

Help across Punjab

Send the alarm name and a photo of the screen on WhatsApp. We inspect systems in Faisalabad, Lahore and across Punjab, including systems installed by other companies, as a paid visit.

Send us

Photos of the inverter screen or app alarm, your inverter and battery model, and when the problem happens.